Jira setup
Authorize Tempo through Jira Cloud, discover the projects available to the integration, and enable the projects you want to measure. Incremental syncs use issue update timestamps to keep the dataset current.
Issue and workflow metadata
Tempo stores normalized issue metadata and the status changes required to calculate time in the workflow. Jira status categories are resolved per project so custom workflows can map into consistent states.
- Issue key, title, type, labels, points, priority, and timestamps.
- Assignee, reporter, project, parent, and epic relationships.
- Current status and historical status transitions.
- Project statuses and shared issue types.
Metrics calculated from Jira
Issue cycle time begins when work first enters an in-progress state and ends at resolution. Lead time begins at issue creation. Throughput counts resolved work in the selected period.
- Cycle time and lead time.
- Throughput and bug ratio.
- Current WIP, WIP age, and stale issues.
- Epic progress, child issues, and scope movement.
Link planning data to pull requests
Tempo links pull requests to Jira issues when their branches, titles, or descriptions contain a matching issue key. The link uses those metadata fields.